Hi all.Could someone help with the situation bellow?I have 3 pm actions for the compress equipment and the trigger is based on condition hours.There are some equipments (instruments) that needs to be connected to the main pm action to be generated according to the compress hourmeter.the sequence of conditions are 2000hrs, 4000hrs, 8000hrs and so on.The instrument 01 4k hrs, needs to be connected to the compress 4k and 8k so I’ll not duplicate the pm action of the instrument.Not allowed to connect the same pm action under two different compress pm action. Please see print.Am I missing something or there another way to do this?I tried creating just on pm action including all conditions line in condition tab considering the maint triggers of the work task template but as I generate the WO, the system takes all the work tasks templates to the WO of just one condition (4k hrs for instance).Also tried the replacement function but it’s not possible as there is connection for the related pm ac
If working with PM structure, there will be some strange issues.In this test scenario I have two PM actions with same Event but with different Interval.The PM action 'x' should be generated all the time when trigger the ‘Event generation’ job.PM action 'y' should be included in the structure every third time the ‘Event generation’ job are triggered.But when trying to connect PM action 'x' and 'y' together the PM action 'y' will be updated with the same interval that exits on PM action 'x'.- Yes, the warning message will tell me that (see screen shot 5 in attached document)Attached document include test scenarios from our customer build place and can also be recreated in customer use place environment.I don’t think that is okay, because we want them to be connected to each other in structure every third time, not every time.I hope I can attached a document after this is saved. where I have a step by step instruction.
Hi all.Could someone know if it’s possible to a maintenance plan of the “children” objects based on codition of the main object in structure?E.g.: I have a pump that works by hours.But bellow the pump, there are a couple of components that each one has a pm action.I need to generate work orders based onde the hours measured registered in the pump, and not in the components.if it’s not possible, I’ll need to set the parameter hour for all components and replicate the hours measured in the pump for all of them to have a maintenance plan.tks a lot
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.