In a shop order that has material tied to a certain operation when the operator approves the operation the material is automatically issued even if a pick list has been created and not reported as picked or if the part has been only reserved.
In many cases the operator can move assemblies to the next operation without having all material connected to the operation issued. But if approved the material is auto issued causing discrepancies with the warehouse. This is critical when many operators work in the same big assembly and it is difficult to keep track of the material used.
Is there a wait to stop this?
Thanks in advance.