When creating a new Engineering Revision for a component part (will refer to as lower level) we make the part Active and then Release. At the release stage we check the box to replace the “where used” and select all parent parts (will refer to as sub-level parts) that include the lower-level part in their structures. These sub-level parts are already ‘released’ and previously transferred to inventory. When the lower-level part is replaced, it flips the ‘PDM Preliminary Rev. Change’ from ‘Not Changed’ to ‘Changed’ of all “where used” parent sub-level parts. After the lower-level part is transferred, its “PDM Preliminary Rev Change” will flip from “Changed” to “Transferred.” However, the parent “where used” sub-level parts affected will remain in a “Changed” state. Note this condition has been observed through intentional testing. During a normal business operation, the parent “where used” sub-level parts are not typically viewed on the Transfer Actions screen. Subsequently, at a point
Hi, I have a site that make heavily configurable parts. They have separate part codes for each configuration. Slight variations. On the odd occasion they want to swap the part at the end to another part code on the shop order.This works when adding parts. Receive it in, issue it to the next one and add the additional parts to the material list.So they dont lose reported labour they want to receive the part into stock and issue it to another shop order effectively swapping the part number. However receiving the original part on the original shop order into inventory has risk as they have unissued some component parts and what they are receiving into stock isnt really what it says it is a parts removed.Would you receive it in using W/D/R or condition codes to highlight the fact that it does not conform to the the part received? or cancel all the shop order and start again, would be shame to lose all the labour reporting in cancelling.
Hello, does anyone know if you can create a document revision on a batch record and have it ‘follow’ that batch. For example, if i was to attach a certificate to a certain part in the Inventory Part In stock screen I would like to be able to view that certificate from the Material Transaction History on the Shop order.
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.