Hi,I use IFS Cloud (Application service update: 23.2.1).I create a new file type in the EDM basic data. This is for the .stp Extension (3D Files from CAD)Then I use this new file type when creating a new document revision. When I try to approve the revision, I have this message :“The number of PDF files and/or the combination of view and original files on this document is invalid for PDF signature and certification. If you are an end-user, talk to your system administrator. If you are calling this API from code, check your data or consider using the more specific method to sign your PDF file.”This file type is not PDF so I don’t want (and I can’t) use e-sign for this file.I use several document class to test and the result is the same.If I use a already created file type, this OK, I can validate it without any problems. Does somebody have any ideas about this issue ?Thanks for your feedback if you have same issue.Nicolas.
Hi, For a customer, I try to use the shop floor workbench : In the lower part of the screen, when I move the 707**10 operation forward, the operation 707**20 does not move (that’s OK). I move the operation 707**20 backward, the operation 707**10 does not move (that’s OK). After this, when I see the operation in the Shop Order, the scheduling direction of operation 20 has changed (at the beginning, it was backward scheduling, as the shop order is) : Then when I come back to the shop floor workbench, I just want to move forward my operation 10 (but not modifying the schedule of operation 20 because I want to keep it at the actual date), the result is that the operation 20 is re-scheduled following the operation 10, and the operation 10 as a scheduling direction changed : Does somebody know how to fix a scheduling of an operation to avoid this ? I’ve tried to changed manually the scheduling direction of the operation 20 to “manual” but when I move forward the operation 10, the scheduling
Hi,The customer is using Apps10 (EE)Does somebody know how the load source (in the work center) influate the result of the RRP calculation : In addition, another related question : the customer want to use the same work center for RRP and CRP (that is possible with IFS). After calculation of RRP and CRP, they would like to see the load coming from the master scheduling and the load coming from the order proposals / shop orders on the same screen. Is there any way to do this ?Thanks for your answers.Regards.Nicolas
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.