Hello all I am trying to implement a Kanban replenishment for a part from supermarket to line.when scheduling a new database task, I get an error that the production line does not exist for the replenish source. the problem is that I am not replenishing from a production line but a warehouse (supermarket). In the Kanban circuit, I have set the replenish type as location and everything seems to be correct.
Hello, I have an issue where I want to schedule an automatic reorder point request for a specific part in our manufacturing. I have succeeded this in a test environment but can’t seem to get it working in PROD. I may have missed something but cannot figure it out as I do not receive any errors. If I run a replenishment request for the kanban card, everything works fine and a shop order proposal is generated but not with a scheduled task. Does anyone have an idea as to why this is not working?
I am facing an issue at our factory that when an integration line has a stoppage, the information does not reach manufacturing and the parts manufactured keep clogging the lines. I have found no way to control this in IFS. I have not used Kanban circuits before but I was wondering if this could be a solution. could I set a maximum quantity for a specific part and a reorder point so when the quantity of parts exceeds the set limit, no more shop orders are released into manufacturing? thank you in advance.
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.