Hi all,I am trying to setup master scheduling in IFS Cloud and I want to define the planning time fence (PTF) based on the cumulative lead time calculations of IFS. The PTF is entered as work days in the master scheduled part.When I checked the cumulative lead time calculation results of different bom levels, I realized that IFS mixes up the different lead times for manufactured and purchased parts.Example Bom:Manuf. Part A (Lead time = 50 -> work days based on our calendar) Purchased Part B (Lead time = 14 -> calendar days) The result will be a cumulative lead time of 64 days. This result is neither correct for work days, nor for calendar days. How is everyone else handling this problem?Thank you
Hi all,I was wondering if it is possible to setup an autorization routing template, so that for the first sequence step, the supervisor of the applicant has to authorize. The organization data should be available in HR component.We are on IFS cloud 22R2.Thanks for your helpChristian
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.