Hi all,I have a situation where we need to be able to issue a minimum of 90% of the material required for the Shop order Lot size and enable Operation reporting and receipt of the full Shop Order Lot size.Simplified Material Check enables us to receive the full lot size even when less than the required material has been issued but does not have an allowance setting. Any help would be appreciated.ThanksPaul
Hi All,My understanding is that in a recipe structure where all parts are added in kg and Enter by is Qty weight UoM the Quantity per assembly is the quantity required of each Part in the structure for 1kg of the parent part.However, I have come across a structure with the same settings as above where the quantity per assembly total is 6.4. I can’t see how this has been created, and can’t recreate anyone have any ideas?Thanks
Hi All, We have a client on Apps 9 UPD16 who are looking for the functionality available in Apps 10 regarding the option available for Step Pricing Basis: Order Line.Does anyone know if this was available in a later UPD in Apps 9 or if this could be added to their current environment?Thanks PJ
Hi All,I am working in Aurena and have set up document text for Shipment Packing Lists with the setup as shown below. The phrase has printed out on one Shipment Packing List but not on others. All shipments are for the same Customer on the same site. Can anyone help please?
Hi All, I have a client using Aurena that wants to Print their Shipment handling unit labels when they create the Pick list. The Parts although not reserved are pegged. Does anyone know if this is possible?
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.