Apps10 UPD15I have an As-Built structure for a multi-level lot/batch tracked (non-serial) part PZ-000 lot/batch UDF-6, quantity of 1, that looks like this.I released a multi-level repair shop order for PZ-000, lot size = 1. I manually issued lot/batch UDF-6 to the order. The Multilevel Repair Structure, though, shows lot/batch UDF-12 in the tree. What could be the reason? Was this corrected in a later update?
I am looking for recommendations on how best to manage the migration of documents (300gb+) from an Apps9 database to Cloud. Primary concern is the ‘what to avoid’ type scenarios and also how to monitor during the migration process that the process did not stop or error out and, if it did, what to do next.
23.1.4In Visual Shop Orders Planning, the Material Material Availability Summary chart shows (4) orders with a shortage, and the same part is short on these four orders.My Material Lines Availability chart is filtered from the Material Availability Summary chart.When grouping by Material Line, I can see each instance of this part on its four shop orders. The Remaining Quantity on these orders are 30, 30, 20, and 20 for a total of 100. When grouping by Part, though, the Remaining Quantity shows as 30 not 100. Why is this not showing 100 as the Remaining Quantity for this part on this date?
Version 22.2.1I have a sales part/inventory part setup for Plan Manufacturing Supply on Due Date.The customer order line Planned Ship Date/Time = 12/30/22 2:00 PM.I do not have a Delivery Route configured for this.The customer order line Planned Due Date = 12/30/22 12:00 AM. I expected this to also be 12/30/22 2:00 PM.Is a Delivery Route required to have the Planned Due Date correspond to the Planned Ship Date/Time?
23.2.4In Visual Shop Order Operations Planning, I am trying to sequence operations with characteristics in a Work Center in the Machine Operations Scheduling Gantt.The documentation reads as:To sequence all operations for a resource or work center loaded in the Gantt chart, open the card for the resource or day and click Sequence. To sequence all operations for a resource or work center on one or several days, select the relevant day(s) for the resource and click Sequence. To sequence specific operations, select the relevant operations and click Sequence.For #2, how can a user select the days in the Gantt, where should a user click for this?For #3, when I select one operation in the Gantt the Sequence command is available, but when I select multiple operations the Sequence command is not available.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.