Question

What is the correct value to put in Earned Value Cost?

  • 5 October 2022
  • 1 reply
  • 83 views

Userlevel 1
Badge +3

What is the correct value to put in Earned Value Cost?
I have created a DOP header connected to PJ.
Depending on the Structure Depth setting, the Earned Value Cost value is different.

Please let me know what value should be set for Earned Value Cost.

 

Pattern A:DOP Parts. Earned Value Cost is 420,000

PatternB:Full Level  Earned Value Cost is null(0)

 


1 reply

Userlevel 4
Badge +7

Hi Kumiko,

The progress and calculation can be different based on the progress method that you are using in the Activity as well as the process you are using to handle the DOP supplies.
Are you using separate POs in the activity to provide the supplies for the DOP?

Thanks and Regards,
Pradeep

 