How to change the validity status in project program?
Thank you very much for the input, it is absolutely😀 what we needed.😀
Hi,
If you click with the right hand mouse button on the header of the page, there should be an option for ‘Change Validity’ on the menu that opens:
Hope this helps.
Kind regards,
Johan
Reply
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.