Hi,
We are using an integration from our external configurator to feed the DOP structures with parts and routings. When looking at the Shop order costs for the DOP controlled parts they do not seem to follow the same logic as for the parts that are manufactured to inventory.
As an example, if the routing say 10 h for an operation and the worker is clocked in for 5 hours, we want production to get paid for 10 h, but being able to analyze the clocking to see that the worker did it in 5h. This works for regular shop orders, but for the DOP controlled, the Actual cost calculated is based on 5 h instead of 10.
Shop Floor Workbench is used for reporting the Shop orders. The checkbox “Default time to report” is ticked on Site. Anyone who knows what goes wrong?