I have created a Schedule for a Period length = 56 days with the following pattern:
4 weeks (28 days) with Day Type: 24 hours work in 2 shifts
and
4 weeks with Day Type: Non-working days (0 hour).
When I generate a calendar, it is just containing the working hours.
Non-working hours are not generated for the 5th to 8th weeks.
Pictures are attached.