Question

Simultaneous Indirect Jobs

  • November 3, 2023
  • 0 replies
  • 70 views

Forum|alt.badge.img+3

Hi,

To record the Tank Truck Unload, we make an indirect job record in Shop Floor Workbench so that we have data on the average/maximum unloading times per raw material and number of unloads.
The problem is that an operator can be working on 2 Tank Truck Unloads at the same time, but in IFS he can't start two indirect jobs at the same time. When he starts the second entry, the first indirect job is automatically closed.
Is there a solution to this problem?

Best regards,
Luísa Quintas

0 replies

Be the first to reply!