When authorizing a multi-level PO, is there a way to have the notes carry to the next authorizer?
As I can tell, the notes field is tied only to that step. It would be effective if we could add a note that we want the next authorizer to see.
- $100 authorizer adds a note before authorizing.
- $1000 authorizer can see the note before authorizing.
- etc.