Hi all,
I am trying to calculate the part cost for an alternate different than ’*’.
I have set up a product structure with alternate ‘*’ and alternate ‘1’. For testing purposes, both alternates have the same components. Both alternates have the buildable status.
When I calculate the cost set 5 for alternate ‘*’, no problem is found, and the cost is correctly calculated.
When I try to calculate cost set 5 for alternate ‘1’, I get the message that ‘Manufacturing/Purchase Structure is not found’. In the message log i see that ‘No Buildable/Plannable Structure Revision Found’
The structure exists and is in buildable state.
Am I missing something? Is there anyone used to work with cost calculation for different alternates who has been through this issue before?
Regards