Hello,
Could someone please help with the situation bellow?
I have set up a schedule to transfer the work assignments to mobile with transfer_window = 1.
I understand that the system will transfer just the the of the allocated start.
But the system has transfered all the assignments of different day.
E.g. Allocated start to 08/21/2021, 08/01/2021 etc.
Or the transfer_window means that the system will transfer all previous assignments till the sysdate as I chose “1” in the parameter field?
Tks a lot