Skip to main content

How to perform hardware sizing in PSO?

        To do a hardware sizing in pso what need to be considered . how can we derive how many no of I/O servers and Optimization server is required?.

         Can anyone illustrate with an sample

        

You can refer PSO Architecture and Sizing Guide. It is well detailed. 


There are some instances that the Sizing Guide mention to consult IFS if the scheduling problem is more complex also. Worth keep that in mind too. :)