Dear all, very simple question. I would like to reflect the already reported time on the operation in APB. It works when the Adjust functions are applied (prioritize already reaported, preserve the sequence of the already scheduled), otherwise APB is showing entire lead time of operations. I do not like to use any Adjust functions, sice bot are applied to all operations which is not requested. Is it any way how to do it?Note: IFS 7.5, version of APB 2.6.1.0. I tried to find any LCS solution/bug, maybe I missed the appropriate fix. Thanks for any advice. Best regards,Zdenek B.
Hello all,I have 3 questions related to APB:I am wondering whether it is possible somehow to setup and/or use functionality of APB in order to fulfill need date everytime (consider need dates as a hard constraint). This can lead to situations when operations of the shop order are scheduled partially to the past. I am expecting that the answer is NO, but I just wanna be sure that I haven’t missed anything. Possibilities of fixing scheduled operations in the schedule - presuming these:fixing based on the shop order operation state - do not schedule the released operations fixing by the time fence given by an offset of hours from now/sysdate - configurable from the basic data anything else?What is the difference between the automatic scheduling of Unscheduled operations and Infinite scheduled operations.Thanks for your advices. Best regards,Zdenek Baumelt
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.