At Shop Floor Workbench, the shop order is running, we want to interrupt it, we go to Stop Production, Can we change the default to Ideally, we could assign a default option for the most used interruption cause too.Could we adjust the defaults? Operators 😤 “2 vs 6 clicks, need to run the machine” and they are right. Thank you in advance, 😀
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.