Hi,When it is tried to link a Lobby Element to the page "Organization and Position Assignments" (page/OrganizationAndPositionAssignments/List), the page has a checkbox "Valid Assignments", which by default is checked.Is it possible to add any parameter to the page-link to clear this checkbox, to allow the page to be opened with "Valid Assignments" not checked?When the page opens with "Valid Assignments" checked, user is not able to see the row/rows of the assignments which are not valid on current date.Thank you.
Can anyone share IFSAPP 10 Tax Integration Guide (Vertex) please?
The question is, in 'Work Time Calendar - Basic Data - Schedule', does changing the following screen setup to begin on Sunday require any other connected object setups? If this Period Start Day is changed, what else does it impact?
Example in G2283480:Elimination of Intercompany Sales- internal revenue is eliminated against internal cost. Today this is calculated in ‘group currency’. This gives 10 000 SEK (group currency)- Customer wants to add ‘reporting currency’ amounts in the elimination above, so that the 10 000 SEK can be split up by ‘reporting currency’.The 10 000 SEK actually consists of several intercompany eliminations in reporting currencies (that are not displayed in IFS):IC sales/cost in USD 500 USD = 5000 SEKIC sales/cost in EUR 500 EUR = 5000 SEKCustomer wants to see the currency elimination split in reporting currency, is that possible?
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.