Hi,Is there a way to check shop order shortages for multiple levels deep within its BOM? The Shop Order Material Availibility is close but it only checks the immediate BOM level below. What I would like to see is it pick up a shortage say from a purchased part that feeds into a sub-assembly and that sub-assembly feeds into top level assembly which is the shop order. Thanks in advance!
Hello,I work with IFS 10 and have run into sort of a systematic issue. We use PMRP (Project MRP). The issue is with spare parts calculation and engineering changes. Here is an example:Let’s say we have a parent say Part A and it needs 10 of Part D. Our system will apply a 30% spares to this requirement. So total demand is for 13.Then one day engineering has developed their designs further and determined parent Part A needs sub-assembly Part B and sub-assembly Part C. Both sub assemblies Part B and C will require Part D of 5 each.So the system will apply 30% to each individual demand of 5. 30% of 5 is 1.5 and the system will round up to 2. So total parts will be 14 instead of 13. Our intention is to order 13 of Part D. This is a simple example but obviously applying this to hundreds and thousands parts we buy you can see that it causes a lot of excess buying.Is there a way to apply sparing to say cumulative demand by part? Preferably by activity sequence?Thank you in advance.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.