Hi,Is there a way to check shop order shortages for multiple levels deep within its BOM? The Shop Order Material Availibility is close but it only checks the immediate BOM level below. What I would like to see is it pick up a shortage say from a purchased part that feeds into a sub-assembly and that sub-assembly feeds into top level assembly which is the shop order. Thanks in advance!
Hello,I work with IFS 10 and have run into sort of a systematic issue. We use PMRP (Project MRP). The issue is with spare parts calculation and engineering changes. Here is an example:Let’s say we have a parent say Part A and it needs 10 of Part D. Our system will apply a 30% spares to this requirement. So total demand is for 13.Then one day engineering has developed their designs further and determined parent Part A needs sub-assembly Part B and sub-assembly Part C. Both sub assemblies Part B and C will require Part D of 5 each.So the system will apply 30% to each individual demand of 5. 30% of 5 is 1.5 and the system will round up to 2. So total parts will be 14 instead of 13. Our intention is to order 13 of Part D. This is a simple example but obviously applying this to hundreds and thousands parts we buy you can see that it causes a lot of excess buying.Is there a way to apply sparing to say cumulative demand by part? Preferably by activity sequence?Thank you in advance.
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.