Hi Experts, When sending jobs to PSO , it needs an element of time before it sets the job in the correct place, does anyone know how long this duration is? Can the duration be altered? Is it based on the system that PSO is installed onto?For example, we are seeing jobs with a fixed person go over to PSO in the space for the wrong person, PSO then goes through the motions before then putting the job in the correct space, but this sometimes takes a while.Are there any parameters that can be altered to help? Would reducing the plan quality (currently at 100) help with this? Thanks