If you want the control plans to be Part based not process based, I believe that you do your analysis at the end of the process. If that is the case, you can use Control Plan – Inventory instead of Control Plan – Manufacturing IndigoCard. So you perform Analysis for a specific part at a specific location. Could be the outbound location of the last operation. Thanks for the update and quick reply. I'll be sure to keep an eye on this thread. Looking for the same issue. Bumped into your thread. Thanks for creating it. Looking forward for solution.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.