Hi @KristinaB , Does it mean that the existing subassembly is used as a component in the product structure of the newly created part ? And customer does not want the cost of the subassembly to be re-calculated when the cost of the new part is calculated ? If that’s the situation, customer can perform the cost calculation for only the top level (One level part cost calculation). Thanks, When I try that the changes in the cost of purchased components on the same level as the subassembly is not taken into consideration either. they want all other changes to be considered, but exclude some parts.Might even be that they have one new subassembly and one old, the old one should be left untouched and the new one should be calculated. Is the solution then to manually calculate all levels and parts one by one bottom up to get the correct cost on top level without re-calculating the subassembly?
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.