This actually seem to be an example where the condition-based predictions can be used. When accumulated condition-based PM action is set to Performed Value Based = Yes, user has the option of choosing which method to use to get the Value at Maintenance, in order to generate the condition-based maintenance forecast. This can be done using the Condition Forecast Configuration in the PM action/General tab. The DEFAULT value will be set as Last Measurement at Maintenance, but should in your case be changed to Predicted Value at Maintenance.The prediction is done either by deriving next maintenance date using interpolation or, as most probably in your case, by using an average usage per day under the assumption of linear usage. In this case the formula used is Next planned value = (Actual Last Work Task Completion Date - Previous Measured Date) * Running Average + Previous Measured Value + PM IntervalThe details on this can be found in the IFS online documentation on page About PM Plan foun
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.