Check the MRP parameters and settings in IFS. Ensure that the MRP run for the site is configured correctly, including the planning horizon, safety stock levels, reorder points, lead times, and lot-sizing methods. Incorrect settings can result in unpredictable supply generation.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.