Hi All,

 

Is there a possibility to see a Gantt of my Project Baseline or history logs so I can compare planning details in a visual way?

 

thanks,

Kurt

ok, Baseline I found in the settings on the Gantt as a coloured line under my activity blocks, but the intermediate history logging, I do not see an option. Anyone?


Hi Kurt,

 

I believe what you need is a graphical representation (visual aid) of the history loggings and/or pre and post baseline details. For that, you can use the History tab for project/sub project/ activity level. The graphical representation will depict the data categorized based on the information fetched date. Refer the below image for an example.

 

 

Please let us know if this is not what you have intended to receive, if so the community can further address your exact requirement.

 

Best regards,

Ushan


Hi,

 

Thank you for the information but I would have hoped to be able to see a comparison in the activity blocks on the Gantt between current and history.

regards,

Kurt