We are testing Project Delvierables with parts that are After Delivery Serial Controlled.

 

We are facing issue when final product is to be installed at client site, we have work order to perform this job. since it is to be issued to the delivery structure, per configuration, at this moment the serial no should be identified and captured by the delivery structure, but we have problem doing this, basically we found no place to have this info entered into IFS.

 

We have a very simple delivery structure, top part is a manufactured part, and child is a purchased part, both are after delivery serial tracking. We now have them installed via a work order, see below, on work order material line, i can see this top part RHITEM4 is a serial controlled part. our question is, where we can add the serial no into IFS?  Thank you.

 

Be the first to reply!