Question

Project Activity ID sequence

  • 30 January 2023
  • 0 replies
  • 81 views

Badge +1

When entering Project Activities using the following numbering structure, it automatically places the order by grouping the numbers as shown, resulting in 1.10 being listed before 1.2 etc.  Is there a way to prevent this?  

1.1

1.10

1.11

1.2

1.3

I want the sequence to be as follows:

1.1

1.2

1.3

1.10

1.11

 


0 replies

Be the first to reply!

Reply