Hi,
Our testing (IFS Cloud 23R2) showed that a project with several subprojects can’t be completed at once. Instead each subproject has to be closed seperately.
Is this standard behavior or am I missing something? According to the verbal documentation it sounds like it would be possible anyway but looking at the process chart makes us assume it isn’t.
Thanks,
Volker