Solved

CBS (csot breakdown structure) issue

  • 28 March 2024
  • 1 reply
  • 25 views

Badge +5

HI,

 

I get the below error message when I add the CBS to the project

 

 

and I have added all the elements in the cost/revenue element code part value.

 

 

 

 

Best regards,

Ken.

icon

Best answer by Johan Lagerström 2 April 2024, 14:32

View original

1 reply

Userlevel 4
Badge +7

Hi @ken miles,

You typically get this message if you have have added new cost elements to the basic data (and included in your CBS) after the project was created, so could this perhaps be the case?

If so, the solution would be to add the missing cost elements in the PCE Code Part tab in the Project Setup Parameters page:

 

Hope this helps.

Kind regards,
Johan

 

Reply