In our production process we would like to have a different routing after each 50 units which are produced. This alternate routing should send the produced items to an external control center (outside operations) is there a way to implement the requested process in standard IFS. The lot size will not be higher than 10 pcs at the time. So, the alternate routing should be triggered based on the cumulative units produced.