We thought we heard at the last WOCO that there is now in Apps 10 a setting that will automatically stop all clockings at the end of the ‘work week’. So if the last shift of the week is 2nd shift on Friday, for example, it will stop all clocking that are started, in case the operator forgets to do so. I have looked at all kinds of basic data, site settings, calendar setting, system parameters, manufacturing standards and am still missing it. Can someone please point me to where to set it?
Thanks