Hello,
I’m noticing an issue on Shop Floor workbench. Currently, we have a 1st and 2nd shift. Shop Orders may span multiple shifts and it appears that if an operator on a prior shift (1st) is clocked into Start Production, a 2nd shift employee cannot join that operation without creating a Team and joining that. Is this correct, or is there a way to allow individuals to Start Production on operations without having to use a Team? Thank you!