Skip to main content

Hello,

How can I start the production of an operation block, using timeclock interface?

 

It is not possible to start an operation block from Time Clock. You must start the operations connected to the operation block one-by-one.

If you instead use Shop Floor Workbench, you can scan/enter the barcode of the Operation Block ID which will populate all the operations connected to the operation block. Then you can select them all start start/stop them simultaneously.


Reply