Hi,
Please refer the test plan below (attached with screenshots) and Advise.
This was observed in 23R1.
Create a Product structure with a manufactured part consisting of two or more purchase parts.
Create an operation for the manufactured part under routing and link the two purchase parts for the operation
Create a shop order for the part and release the shop order
Go to shop floor workbench and attempt to issue materials for the operation in the relevant shop order
Notice that the system only allows the user to issue only one material at a time.
If the user needs to issue the other material to the operation, they have to start over from the beginning as there is no option to select multiple materials to be issued at the same time.
For an operation with a considerable number of materials this could cause more time to the shop floor workbench user as they have to move back and forth to issue materials.
Could this be considered for a future enhancement where the user would be able to issue multiple materials?