Scenario: Shop order operation is for a quantity of 10. Emp 1 will complete 6 and Emp 2 will complete 4. They cannot be part of a static team (I think) because they normally would not work on the same shop order at the same time. They will probably start and finish at different times.
We just purchased SFWB licenses. I am making sure we are doing this the most efficient way possible. So far I have:
Emp 1 Starts Production
Emp 2 Uses Modify Ong Op to join the operation
Emp 1 uses Approve Op and changes Qty to Report to 6 and does not close operation and does not stop clockings because Emp 2 is still working on the operation.
Emp 1 then uses Modify Ong Op to leave the operation.
Is there any way for Emp 1 to report a qty complete and leave the operation at the same time instead of doing it in two steps as I have above?
Thanks