Hi @Carole,
These are all the calculated values and cannot be manually edited. This values are automatically chosen based on the predefined set of rules.
Regards,
Mithun K V
Hi @EqeMithuV ,
Even if the control plan is not active...What a pity !
In our purchase flow, we are qualifying a part at the manufacturer which is the supplier but periodically, for timing reasons, we need to purchase the same part from a distributor. The manufacturer is the same but the distribution chain is different.
Consequently, we would like to set the acceptance sampling parameters with the same quality levels and inspection frequency on the control plans of the distributors.
And as we can have many distributors for the same part, it will be difficult to reach the 20 lots used for qualification in order to have a change in the inspection frequency.