Hi, using Apps 10 and i am having an issue with scheduling operations within a work centre.
we have individual work centres and labour classes for each 4 operation within a routing and only 1 person in each of the labour classes.
the schedule capacity on each of the work centres and labour classes (and individuals within the labour classes) are set to finite in order for MRP to see the constraint when scheduling.
How even MRP is run it schedules operations to start before the previous operation has finished which is physically impossible. (see below)
On the inventory part there is also a 1 day order gap to try and stager the shop orders being released.
why is MRP ignoring the constraints of the work centres and labour classes or am i doing something wrong?
regards
Jamie