Skip to main content

If I need 15 pallets to manufacture 10800 finish products, I have to enter Qty per assembly 0.00138888888888889 in the structure.

 

When I create the Shop Order for lot size 10800, my Qty Required is calculated as 16, because 15.00001 is roundup as Cal Rounding is Zero.

 

This results an addition one pallet calculated as Qty Required for each Shop Order which is wrong. Can this be avoided?