Skip to main content
Solved

Qty Required Excl Planned Scrap / Shop Order Receipt

  • Aug 22, 2024 2:56 PM UTC
  • 1 reply
  • 197 views

Forum|alt.badge.img+5

When you receive a shop order, what is the calculation behind the scenes regarding check on the amount of material issued.

 

I currently have the following scenario:

 

Shop Order Lot Size = 10

Material A

Qty per Assembly = 1

Qty Req Excl Planned Scrap = 10

Scrap Factor = 20%

Qty Required = 13

Qty Issued = 13

 

Despite the lot size being 10, I can over-report to 13.

 

However, let’s say we increase the lot size to 11. I now have:

 

Shop Order Lot Size = 11

Material A

Qty per Assembly = 1

Qty Req Excl Planned Scrap = 13

Scrap Factor = 20%

Qty Required = 14

Qty Issued = 13

 

For some reason in this scenario, I can only report upto 10pcs. Reporting any more results in error message ‘Not enough components issued to receive this quantity’.

 

Assuming I’m missing something, but I cannot see how I can report 13 in the first instance, but then only 10 in the second, despite the Qty per Assembly and Qty Issued not changing?

Best answer by LALEXANDER15

Self-solved.

 

We had Reserve/Issue Planned Scrap enabled. Where Qty Issued < Qty Required, this appears to prevent us receiving the full qty on the shop order, in cases where materials have a Scrap factor % defined.

 

With the box unchecked, we can receive in this scenario upto the lot size of the order, provided enough materials have been issued to the Qty Req Excl Planned Scrap.

View original

1 reply

Forum|alt.badge.img+5
  • Author
  • Sidekick (Partner)
  • Answer
  • Sep 2, 2024 9:11 AM UTC

Self-solved.

 

We had Reserve/Issue Planned Scrap enabled. Where Qty Issued < Qty Required, this appears to prevent us receiving the full qty on the shop order, in cases where materials have a Scrap factor % defined.

 

With the box unchecked, we can receive in this scenario upto the lot size of the order, provided enough materials have been issued to the Qty Req Excl Planned Scrap.