Skip to main content

There are  parts which have repair, assembly product structures to either repair or assemble. but sometimes it is only 60%-80% parts are required to do the repair or assembly.

 

Is there any way to that it can be fed to the IFS 10 Application as a factor so that it will be considered when replenishment.

 

 Is there a way in IFS to help order items that are not used 100% of the time?

Be the first to reply!

Reply