There are parts which have repair, assembly product structures to either repair or assemble. but sometimes it is only 60%-80% parts are required to do the repair or assembly.
Is there any way to that it can be fed to the IFS 10 Application as a factor so that it will be considered when replenishment.
Is there a way in IFS to help order items that are not used 100% of the time?