Hi,
I have an issue where the project -> demand-> misc.parts -> planned cost is calculated based on the company tax even though the project tax is already set to 0.
1. Company tax is set to 5.5% (address tab)
2. Project window -> address tab -> the tax is set to 0
3. Project window -> demand -> misc.parts -> added a new line with a purchase part-> once saved the planned value is calculated with the company tax
Tried the same thing in core but I was able to get the planned value without company tax.
Any suggestions on windows/fields that I should check to identify possible setup differences ?