After adjusting the calendar to reflect overtime, re-generating and re-calculating capacity etc, the capacity shows up as available in the APB (see attached picture) but it is impossible to place any load on the time added - no matter if you’re doing a re-scheduling or manual drag-and-drop. If I use the manufacturing visualizer to drag-and-drop, the extra capacity is used so it’s just the APB that isn’t working. Version is App10, upd 13.

@Björn Hultgren - have you seen this behaviour?


@AddMikaeA Unfortunately I have no insights in this.


Found it, it was a labor class with infinite albeit separate schedule that interfered so that schedule needed adjustment as well.