Question

Manufacturing Control plan line - Attribute Data Type

  • 18 September 2023
  • 2 replies
  • 38 views

Badge +4

Apps 10 Manufacturing Control plan line - Attribute Data Type - Inspection code C- Sample quantity 1. 

When entering Analysis results, why are you forced to enter a value in the Nonconformities (np,p) column, when you only want to track Nonconformities (c, u).  # Defects in the sample, not # of items with defects.  Do you have to uncheck the SPC checkbox?

 


2 replies

Badge +4

Looks like it works if you uncheck the SPC box….but what if you want SPC…

 

Userlevel 4
Badge +9

You can enter 0 when no defective items found.

Reply