Hi all,
We are running a production with a considerably amount of programming (cad/cam/dtp) between operations. We need to register the time used. For that we have created a the work center, Programming. The routing can look like this:
This leaves us with some challenges. The main one is that programming can finish before and after the other operations. E.g. operation 20 can finish before operation 10 (not possible in IFS) and the other way around.
We suspect that we should do this in another way. Any suggestions?