Community,
i have a shop order, lot size 3, parent part is serial controlled. there are 1 component line in this order, with assembly qty 1. it is also serial controlled.
now I register 3 serial no into this shop order, they are S1, S2, S3, mean time i reserve the qty 3 component serial to the material line, they are L1, L2, L3. complete the shop order and receive all qty 3 parent part into stock.
question here, if I do in the way described above, will IFS will have L1 installed onto S1, S2 or S3?
I would like to have L1 installed onto S1, L2 onto S2, L3 onto S3, how to make this happen?
Thank you.