Hi,
Is it correct that the cost that is showing on the sales quotation line, is not connected to the “Total cost per unit/ base” of the connected estimate but instead to the “Total Variable Cost per Unit/Base” in the the Estimate?
For example, if I have “Total Variable cost per unit/base” of 11.38, this is the value that will be fetched in the sales quotation once I update it and it will ignore the total additional cost per unit/base and will not take the Total Cost per unit/base.
Estimate:
Is this the standard IFS behaviour or in which situations is the “Total Cost per Unit/Base” fetched as a Cost in the sales quotation line?
Thank you!