Receive error message when trying to copy/paste from one Estimate item to another Estimate item.

Error “The Estimate Node does not exist. “

 

But possible to save add new line with same product.

Why this error come when copy/paste from one Estimate item to another Estimate item.

Probably something is not correct.

@dameenda can you please assist? thanks !


Hi Buddhika, there have been situations in the Aurana Client when it comes to Copy Paste and Duplicate, also bugs in the code. Since the issue is recreating please report a BUG.


Thanks @dameenda for the confirmation. 

@Sivanandan Tested this with new estimates (#95 and #96 in 23R2) for the same top part and observed the same issue when Copy - Paste a line to #96. Then I added the same part manually in #96 saved it and then copy-pasted the line, then observed no error.

Consider reporting this, thanks !

 

 


Thank you  @Buddhika Kurera 


Thank you @dameenda 


R&F indented to fix   